Home / Services / Steel structure design (structural and detail drawings) / KMD sheet and specification example: what a member drawing consists of and what the fabricator reads first
Steel structure design (structural and detail drawings)
KMD sheet and specification example: what a member drawing consists of and what the fabricator reads first
A KMD sheet is not read left to right but by what the shop needs: what to cut, what it weighs, how to weld it, what to fasten it with and whether the piece fits into the galvanizing bath. Below this is worked through on a notional welded beam: where the view and the sections sit on the sheet, what the title block holds, how mass is counted in the specification, how welds, holes and coating are shown, which mistakes turn up most often and what is checked before the drawings go to production.
Contents
- The notional member used for the walk-through
- How the sheet is laid out
- The title block: what it must contain
- The shipping-piece specification with masses
- Welds: what to state
- Holes and fasteners
- Coating and dimensions for galvanizing and painting
- Erection marks, tolerances and what goes to site
- Schedule of shipping pieces and metal take-off: how to check against the sheet
- Typical mistakes on the sheet
- Checklist before release to production
- What the production department of POLYGONAL checks when it receives drawings
- Standards and validity
The notional member used for the walk-through
All dimensions, numbers and designations in this article are invented. It is an illustration of what a sheet contains, not a drawing for fabrication: nothing is made to these numbers, and a real beam is designed separately first (see steel beam calculation).
The member is a welded I-beam 6000 mm long. The web is a 8×400 plate, the flanges are 12×180 plates, and 16×180 end plates with bolt holes are welded to the ends. Inside there are three pairs of stiffeners, on the top flange two lifting lugs, and on the web four seats made of L50×5 angle for purlins. The steel is notionally S345, and after fabrication the beam is hot-dip galvanized.
On the erection plan such a beam carries the mark B1, and on a KMD sheet the mark gets a KMD sequence number, so the member is called B1-3 (the same way as K1-3 in the rules for KM and KMD drawings). The example has twelve such beams.
How the sheet is laid out
The main view of a shipping piece is drawn in its working position: the beam is horizontal, so it is drawn horizontally. Scales for shipping pieces in KMD are taken from the 1:10–1:50 range, for small edge details 1:1, 1:2 or 1:5. In the example the view is 1:20, the sections 1:10 and the detail 1:5. The standard recommends placing the specification in the right-hand part of the sheet; in its examples it stands at the top right.
The zones below are typical. In a real set they depend on the member: a truss needs a geometry diagram, a bent part needs a developed view with the radius and bend direction.
| Zone of the sheet | What is in it | Why the fabricator needs it |
|---|---|---|
| Main view, 1:20 | The beam in working position with the 6000 overall length, item numbers 1–6, distances to the stiffeners and seats | Reading starts here: length, assembly order, what stands where |
| Section 1-1, 1:10 | Cross-section at mid-length: web, flanges, stiffener, leg sizes of the flange welds | Thicknesses, relative position of parts, leg size of weld W1 |
| Section 2-2, 1:10 | View of the end plate: 180×424 outline, four Ø22 holes and their coordinates | Hole positions: the joint with the column is assembled by them |
| Detail A, 1:5 | Stiffener corner at the flange: 20×20 cut, distance to the weld, leg size of W2 | Shape of the cut for galvanizing and edge preparation |
| Specification, top right | Parts table: items 1–6, quantity, length, mass, steel, remarks | Link between items on the view and the metal that is ordered and cut |
| Title block, bottom right corner | Code, name, mark B1-3, stage, sheet number, revision column | Whether this is the current revision and the set is complete |
| Technical requirements | Steel, welding, weld inspection, fasteners, coating, tolerances | What did not fit on the views but affects the shop |
The title block: what it must contain
The form of the fields and the frame sizes are set by the standard for title blocks, and there is nothing to invent. What matters to the fabricator is something else: from the block he must understand which sheet this is, which set it belongs to and which revision. So below it is not the layout but the data people look for first.
Part of this data is in practice moved from the title block into the specification or the technical requirements. The main thing is that each quantity stands on the sheet once or, if repeated, has the same value.
| Data | What is entered | Example (notional) |
|---|---|---|
| Set code | Project code and documentation mark | UM-01-KMD |
| Name of the member | What the member is | Beam B1-3 |
| Mark designation | The same as on the erection plan and in the schedule of shipping pieces, plus the KMD number | B1-3 |
| Stage and documentation mark | KMD or KM-KMD | KMD |
| Sheet and number of sheets | So that it is visible whether the set is complete | 3 of 12 |
| Steel and mass | If shown in the block, they agree with the specification | S345; 397.6 kg |
| Revision and date | Revision number, what was changed | Rev. 1: leg of W3 clarified |
| Signatures | Drawn by, checked by | signatures in the fields |
The shipping-piece specification with masses
The specification columns follow the rules set out in the article on KM and KMD drawing rules: part number, section, length (for flat parts the longer side of the circumscribed rectangle), quantity, mass of one and of all parts, steel, remark. At the bottom are the mass of the parts, the weld metal on a separate line and the total mass of the member.
Items 1–6 are numbered in ascending order, and the same numbers stand on the views and sections. Parts keep their final dimensions after all operations: allowances and shrinkage are not shown on the drawing, the shop’s process documents set them.
| Part No. | Section | Length, mm | Qty | Unit mass, kg | Total mass, kg | Steel | Remark |
|---|---|---|---|---|---|---|---|
| 1 | Plate 8×400 | 6000 | 1 | 150.8 | 150.8 | S345 | Web |
| 2 | Plate 12×180 | 6000 | 2 | 101.8 | 203.6 | S345 | Flanges |
| 3 | Plate 8×86 | 400 | 6 | 2.2 | 13.2 | S345 | Stiffeners, cut corners 20×20 |
| 4 | Plate 16×180 | 424 | 2 | 9.6 | 19.2 | S345 | End plates, 4 holes Ø22 |
| 5 | Plate 10×100 | 120 | 2 | 1.0 | 2.0 | S345 | Lugs, hole Ø30 |
| 6 | Angle L50×5 | 300 | 4 | 1.2 | 4.8 | S345 | Seats for purlins |
| Total of parts | 393.6 | ||||||
| Deposited weld metal, 1 % | 4.0 | ||||||
| Mass of member B1-3 | 397.6 |
The example is notional. In a real specification the steel in each row is supplemented, where needed, with impact toughness requirements and a weldability guarantee: this is how rolled steel is ordered (see the article on steel grade selection).
Where the mass figures come from
The density of steel is taken as 7850 kg/m³, that is a plate 1 mm thick weighs 7.85 kg per square metre. For the angle the mass per metre from the angle range tables is used: L50×5 gives 3.77 kg/m. Mass is counted to 0.1 kg, rounding up. The table below shows every step so that the arithmetic can be checked.
| Part No. | Calculation | Before rounding, kg | In the specification, kg |
|---|---|---|---|
| 1 | 8 × 7.85 = 62.8 kg/m²; 62.8 × 0.400 × 6.000 | 150.72 | 150.8 |
| 2 | 12 × 7.85 = 94.2 kg/m²; 94.2 × 0.180 × 6.000 | 101.736 | 101.8 |
| 3 | 62.8 × 0.086 × 0.400 | 2.160 | 2.2 |
| 4 | 16 × 7.85 = 125.6 kg/m²; 125.6 × 0.180 × 0.424 | 9.586 | 9.6 |
| 5 | 10 × 7.85 = 78.5 kg/m²; 78.5 × 0.100 × 0.120 | 0.942 | 1.0 |
| 6 | 3.77 kg/m × 0.300 m | 1.131 | 1.2 |
| Welds | (150.8 + 203.6 + 13.2 + 19.2 + 2.0 + 4.8) × 0.01 = 393.6 × 0.01 | 3.936 | 4.0 |
The mass of all parts in the example is taken as the rounded unit mass multiplied by the quantity (item 2: 101.8 × 2 = 203.6), so that every row reads without discrepancy. The rounding rule adopted in your set is written in the general data and is the same on all sheets.
What is not included in the mass
The reduction in mass from bolt holes is not taken into account: the drawing rules say so directly, unless the design brief requires otherwise. Parts with cut corners, like the stiffeners, are counted by the rectangle they fit into, because it is under 0.2 m². Lifting lugs are part of the mark mass because they are shown on its drawing.
The mass in the specification is the mass of black steel before galvanizing: zinc adds mass, and it is accounted for separately when transport and lifting are calculated. Bolts, nuts and washers are not part of the mark mass: in the example they are moved to their own schedule.
Welds: what to state
For each weld the sheet must show the type of joint, the kind of weld, the leg size for fillet welds, the length or pitch for intermittent ones, whether it is a shop or a site weld and the inspection requirement if it is above the usual. The leg size is set by the design, not by the shop: a welder does not pick it by eye. The upper limit of the leg is 1.2 times the thickness of the thinner part, the lower one depends on the thickness of the thicker part and on the yield strength of the steel (guidance in the article on weld joint types).
The way welds are drawn on the views is taken from what is adopted in the set: a table of conventional symbols on the general data sheet or symbols under the standard for weld designation. In the example the welds are named in words, so as not to stand in for the standard.
| Weld | Where | Joint and weld | Leg, mm | Shop or site | Inspection |
|---|---|---|---|---|---|
| W1 | Web to flanges, both sides along the whole length | T-joint, double-sided fillet, continuous | 6 | Shop | Visual |
| W2 | Stiffeners to web and flanges | T-joint, fillet | 5 | Shop | Visual |
| W3 | End plates to web and flanges around the contour | T-joint, fillet | 8 | Shop | Visual; ultrasonic if the design requires |
| W4 | Lugs to the top flange | T-joint, fillet | 6 | Shop | Visual |
| W5 | Angle seats to the web | T-joint, fillet, around the contour | 4 | Shop | Visual |
The legs are notional and not taken from a calculation: only the upper limit of 1.2 times the thinner part was checked (for W1 it is 9.6 mm, for W5 6 mm). The lower limit for a real member is taken from the codes, see the section on standards.
If the beam has a butt joint
In the example the web is continuous, so there are no butt welds. If the web plate were butt-jointed, that weld would have its own designation with edge preparation, and the sheet would carry an inspection requirement, for example ultrasonic. We do not carry out radiographic testing, and such a requirement is stated in the enquiry in advance, see quality control of steel structures.
Holes and fasteners
Holes are given by number, diameter and coordinates from a datum axis or edge, not just “4 holes”. In the end plates of the example there are four Ø22 holes for M20 bolts; the hole diameter is notional, the clearance in a real joint is set by the design. The plates are 16 mm thick, so the holes are drilled, not punched: in parts over 6 mm cracks may appear near a hole after punching (see design for galvanizing).
Fasteners go into a schedule of erection items separate from the rolled steel, and for each the diameter, length, class and coating are written. The bolt + nut pair is named together: a bolt of class 8.8 goes with a nut of class 8, as in the article on fastener strength classes. The bolt length is chosen by the grip: the sum of the part thicknesses, washers, the nut and the thread protrusion.
| Item | Designation | Qty per mark | Where | Remark |
|---|---|---|---|---|
| Bolt | M20×70, class 8.8 | 8 | End plates, 4 at each end | With a class 8 nut |
| Nut | M20, class 8 | 8 | On every bolt | The thread for galvanizing is agreed with the plant |
| Washer | 20 | 16 | Under the head and under the nut | Two per bolt |
The mass of fasteners is taken from the fastener range tables; in the example it is not part of the mark mass.
What else is written about the joint
It is stated separately whether the bolts are tightened with controlled pretensioning: that is another group of sets, and they are bought ready-made. If a joint is mixed (some connections bolted, some welded), this is visible on the sheet. For galvanized fasteners the schedule gives the galvanizing method and the threads.
Coating and dimensions for galvanizing and painting
In the technical requirements the coating is written in a phrase or two: the method (hot-dip galvanizing, powder coating or their combination), what is measured, which surfaces and threads are not coated. The zinc thickness for the piece is taken from the standard according to the steel thickness, see zinc coating thickness. For painting the RAL colour and gloss are added.
The rest is decided by the shape of the parts. The stiffeners have 20×20 corner cuts at the flange and the web: in a corner where three planes meet, zinc does not reach and the flux has no time to evaporate. The lugs, besides lifting, can be used for hanging in the bath, but the hanging points are agreed with the galvanizing plant. An open I-section has no closed cavities, so vent holes are not needed. The ratio of the greatest thickness to the smallest here is 16 : 8 = 2, and for welded assemblies we ask to keep it no more than 5 : 1.
The overall size is checked separately. Our galvanizing bath is 13 000 × 1 600 × 3 200 mm, and a 6000 × 424 × 180 mm beam lies in it with room to spare. The powder coating chamber is 6 m long, 1 m wide and 1.8 m high; the beam length equals the chamber length, so there is no margin, and before releasing a drawing that requires painting this is agreed with the shop (more in the article on powder coating cost factors). If the piece goes for a duplex system, galvanizing and painting are agreed together at the drawing stage.
Erection marks, tolerances and what goes to site
The mark on the sheet must match the mark on the erection plan: the member is found on site by it, and the partner construction company that carries out erection checks the beam position in the frame by it. Erection dimensions (grid references, levels) stand on the erection plan, while the mark sheet carries the dimensions for fabrication and for the relative position of parts.
Tolerances are written on two levels. In the technical requirements there is one phrase about general fabrication tolerances under the document named in the brief. Separately, on the views, stand the dimensions where the tolerance is tighter than the general one; in the example these are the distance between the end plate holes and the straightness of the beam axis: the joint with the column depends on them. Tolerance figures are not given in this article because they depend on the document adopted in the project.
Schedule of shipping pieces and metal take-off: how to check against the sheet
The schedule of shipping pieces collects marks with their quantity and mass, and the metal take-off lists the same metal by section and thickness, because that is how it is ordered. Both must agree with the sheet. In the example twelve beams B1-3 give 12 × 397.6 = 4 771.2 kg.
| Rolled steel | Per mark, kg | For 12 marks, kg |
|---|---|---|
| Plate 8 (web and stiffeners) | 164.0 | 1 968.0 |
| Plate 12 (flanges) | 203.6 | 2 443.2 |
| Plate 16 (end plates) | 19.2 | 230.4 |
| Plate 10 (lugs) | 2.0 | 24.0 |
| Angle L50×5 | 4.8 | 57.6 |
| Deposited weld metal | 4.0 | 48.0 |
| Total | 397.6 | 4 771.2 |
The sum agrees with the schedule of shipping pieces. If two figures differ, the error is sought in the mark specification or in the number of marks, not in the sum.
Why a mass discrepancy is a warning sign
A discrepancy of a few percent between the specification and the take-off usually means that in one of the documents the quantity was not updated, the welds were left out or the rounding was done differently. Metal is ordered from such a take-off, so the error has a price before cutting even starts.
Typical mistakes on the sheet
- the length on the main view is 6000 and in the specification 5980: a contradiction between views is found at assembly, when the parts do not come to size;
- an item on the view without a number, or a number that is not in the specification: the shop does not know what the part is or how many there are;
- the mass does not add up: the total is not the sum of the rows, the weld metal is missing or the take-off counts a different number of marks;
- no steel grade in the specification, in at least one row, and the metal is ordered “by analogy”;
- no weld leg given: neither the welder nor the process engineer picks it, and the drawing goes back for clarification;
- a weld is not called shop or site, and it is not visible what to do in the shop and what on site;
- mirror-image parts without the “т” and “н” indices or without a note that the numbering is continuous;
- a closed dimension chain, where the sum of partial dimensions is not equal to the overall size;
- a member that does not fit into the galvanizing bath: length over 13 000 mm or a closed cavity without holes. Dipping in two passes is sometimes possible, but it is agreed separately;
- one sheet corrected and the rest not updated: drawings of different revisions lie in the shop.
Checklist before release to production
Before issuing the set, the author checks each item. This does not replace a review; it is the minimum after which a drawing does not come back with obvious questions.
| What to check | What exactly to compare |
|---|---|
| Completeness | All sheets from the drawing schedule are present, numbering has no gaps |
| Mark | The designation on the sheet, the erection plan and the schedule of shipping pieces is the same |
| Items | Every item on a view has a number from the specification and the other way round, mirror parts are marked |
| Dimensions | The overall size equals the sum of dimensions, views and sections do not contradict each other |
| Mass | Specification rows, weld metal, total and metal take-off agree under one rounding rule |
| Steel | Every row has a class or grade, and the technical requirements carry impact toughness and weldability where needed |
| Welds | Type, leg size, length, shop or site, inspection requirement |
| Holes and fasteners | Hole diameter and coordinates, bolt and nut class, quantity in the fastener schedule |
| Coating | Method, uncoated zones, threads, cuts and holes for galvanizing, RAL colour for painting |
| Overall size | Length, width and height fit the galvanizing bath or the painting chamber and the transport |
| Tolerances | A general phrase in the technical requirements and the tighter dimensions on the views |
| Revisions | The revision number is the same on all sheets, the revision column states what changed |
What the production department of POLYGONAL checks when it receives drawings
We fabricate steel structures to the customer’s drawings, so the first thing the production department does is read the set in the same order as this walk-through: drawing schedule, general data, erection plan, mark sheet. They look at whether the set is complete and whether the views, the specification and the metal take-off contradict each other.
Then the drawings are looked at through the eyes of the shop: which metal and in what thicknesses has to be bought, how to cut and bend the parts, how to assemble and weld them, whether the legs and inspection requirements are named, which holes to drill, what to galvanize or paint and whether the piece fits the bath or the chamber. Visual inspection of welds and ultrasonic testing we do ourselves, radiographic testing we do not do, and if the design requires it, it must be visible on the sheet.
Questions the drawing does not answer go back to its author before work starts, rather than being settled in the shop by guesswork. If there are no drawings, we prepare them: KM and KMD drawing design, steel fabrication. For the general logic of KM and KMD see what KMD is and KM and KMD stages, and for what a set contains see the article on KMD drawings.
Standards and validity
The article does not reproduce a single requirement of the standard for drawing presentation, and the figures of the example are notional. The rules for counting mass (steel density 7850 kg/m³, rounding up to 0.1 kg, weld metal 1 %), the content of the specification and the list of standards that apply to KM and KMD drawings are gathered in the article Rules for KM and KMD drawings.
The legs, weld types, requirements for holes for galvanizing and fastener classes in this article are taken from our separate articles, where their sources are named. Before a standard is cited in project documents, its status is checked in the current list of national standards: editions change.
Updated:
Frequently asked questions about the KMD sheet and specification
What does the fabricator read first on a KMD sheet?
The title block (to understand which revision it is and whether the set is complete), then the view with the items and the specification. They show what to cut, from which steel and what it weighs. Welds, holes, coating and the technical requirements come next.
Can parts be made to the example in this article?
No. The dimensions, legs, designations and codes are invented to show what a sheet contains. A real beam is calculated first, and the drawing is prepared for it.
How is the mass of plate parts counted in the specification?
Steel density is 7850 kg/m³, that is 7.85 kg per 1 m² for each millimetre of thickness. The result is multiplied by the area of the part and rounded up to 0.1 kg. Bolt holes are not deducted from the mass unless the design brief requires it.
How much to add for weld metal?
Unless the KMD brief sets otherwise, 1 % of the mass of all parts of the member is taken and written on a separate line. When there is more weld, the actual mass is given. In the example it is 4.0 kg for a beam whose parts weigh 393.6 kg.
What most often sends a drawing back for rework?
Discrepancies between the views and the specification, items without numbers, a mass that does not add up, a missing steel grade, a weld leg that is not given, and a member that does not fit into the galvanizing bath or the painting chamber.
Related products: Steel structure design (structural and detail drawings) · Custom steel fabrication
More on this topic: KM Drawings: Contents, Stages, Calculations · What is KMD: meaning and how it differs from KM · KMD Drawings: Contents, Benefits, Cost · KM and KMD Stages: Contents of the Sets · KM and KMD Drawing Rules: DSTU, Specification, Scales · Steel Structure Calculation: Methods and Checks
Get a quote for your requirements
Send us your requirements — we will calculate the price and lead time.