PM Floodlight Masts 12–20 m: Dimensions, Anchor Cages and Scope of Application
Dimensions and scope of application of multi-sided PM floodlight masts, 12–20 m high, set out in tables, with notes on the head frame, foundation and installation.

Contents
What this range is
The PM range covers multi-sided floodlight masts 12–20 m high: a bent steel shaft carrying a fixed or lowering head frame for the floodlights. The figures in the tables come from the catalogue “Structures for outdoor lighting” (2023). The masts are made of steel S245, S255 (DBN V.2.6-198:2014) and hot-dip galvanised to DSTU EN ISO 1461:2024.
From 20 m up, the masts belong to the PMV range (20, 24, 30 and 34 m); the multi-sided equivalents of the standard PMS and PMZh form a separate PMS-B series with a platform height of 16.6–32.5 m. How the PMS, PMZh, PMV and PMK ranges differ is covered in Floodlight Masts PMS, PMZh and Our PMV, PMK; for a general overview of the product line, see Floodlight Masts.
Dimensions of PM masts
The table lists, for each height, the shaft and base-plate dimensions and the anchor cage size. A sample designation: a multi-sided floodlight mast 12 m high is PM-12.
| H, m | ∅a, mm | ∅b, mm | W, mm | v, mm | Wp, mm | B, mm | n×d, mm | Anchor cage |
|---|---|---|---|---|---|---|---|---|
| 12 | 120 | 300 | 500 | 140 | 500 | 400 | M30/6 | FPM-400-950 |
| 14 | 120 | 340 | 500 | 140 | 500 | 440 | M27/12 | FPM-440-850 |
| 16 | 120 | 380 | 500 | 160 | 500 | 480 | M27/12 | FPM-480-850 |
| 18 | 120 | 420 | 500 | 160 | 500 | 520 | M30/12 | FPM-520-950 |
| 20 | 120 | 470 | 500 | 160 | 500 | 570 | M30/12 | FPM-570-950 |
Scope of application: floodlight area and loads
The table gives the total area of lighting fittings that a mast of each height can carry at various wind pressures (Caer = 1, terrain type III). Q is the shear force, M the bending moment at the base of the pole.
Take a PM-16 at 500 Pa: the permissible total area of fittings is 2.59 m² and the bending moment at the base is 102.05 kN·m. A PM-20 at the same pressure has almost the same permissible area (2.67 m²), but its base moment is already 153.63 kN·m. The taller the mast, the greater the moment at the base and the heavier the demands on the foundation.
| H, m | Equipment mass, kg | Q, kN | M, kN·m | 400 Pa, m² | 450 Pa, m² | 500 Pa, m² | 550 Pa, m² | 600 Pa, m² |
|---|---|---|---|---|---|---|---|---|
| 12 | 180 | 5,86 | 63,21 | 3,32 | 2,88 | 2,53 | 2,24 | 2,0 |
| 14 | 180 | 6,83 | 81,15 | 3,4 | 2,93 | 2,56 | 2,26 | 2,0 |
| 16 | 180 | 7,79 | 102,05 | 3,48 | 3,0 | 2,59 | 2,27 | 2,0 |
| 18 | 180 | 8,79 | 125,85 | 3,56 | 3,04 | 2,62 | 2,28 | 2,0 |
| 20 | 180 | 10,01 | 153,63 | 3,67 | 3,11 | 2,67 | 2,3 | 2,0 |
Head frame: fixed or lowering
The head frame (crown) is the attachment that carries the floodlight platforms (cassettes). It comes in two versions, fixed and lowering.
- a fixed crown sits on the top section of the mast, and the floodlights are reached by a ladder to the service platform;
- a lowering crown is brought down by a raising/lowering mechanism (a winch), so the fixtures can be serviced and aimed at ground level without special equipment. It is used on high masts.
Installation, foundation and documents
Installation goes in two stages: the foundation first, then the shaft. So that it can be transported, the shaft is made in sections no longer than 12 m. Before erection the sections are drawn together with a winch, and the crown, the raising/lowering mechanism (only on high masts with a lowering crown) and the rod are then fitted. A crane sets the mast on the foundation studs.
The foundation is reinforced concrete, with a platform (a mushroom) at the bottom to resist overturning. The mast is fixed to anchor studs cast into it on two templates: the templates hold the studs in position, so the holes in the base flange match them exactly.
Construction follows the design documentation, which takes account of the soil geology and the climate of the region. The foundation design can also be ordered from our company. For more on foundation types, see Foundations for Masts, Towers and Power Line Poles.
Corrosion protection is hot-dip galvanising. The masts are supplied with a passport, an operating manual and accompanying documentation.
How to use the load table
The table was drawn up for terrain type III, Caer = 1 and equipment weighing 180 kg. Under any other conditions a separate calculation is needed.
If your wind pressure falls between two columns, take the next one up: the permissible area shrinks as pressure rises, so this leaves a margin. Below 400 Pa, use the 400 Pa column; above 600 Pa the table does not apply. The pressure for your site has to be confirmed by calculation, since W0 is only a starting point, not a final design load (see Wind Regions of Ukraine).
Height barely changes the permissible area: at 500 Pa it moves only from 2.53 to 2.67 m². The load at the base of the mast is another matter, and with it the foundation requirements. From PM-12 to PM-20 the height grows by a factor of 1.67, but the tabulated bending moment grows by a factor of 2.43 (from 63.21 to 153.63 kN·m). So do not pick a taller mast “just in case”: the height comes from the lighting calculation.
Two checks: floodlight area and mass
The table assumes equipment weighing 180 kg (a greater mass needs a recalculation), so a mast has to be checked twice: against the windage area and against the mass of the floodlights. Example for a PM-16 at 500 Pa, where the permissible area is 2.59 m² (the floodlights are hypothetical):
| Floodlight (hypothetical) | By area, pcs | By mass, pcs | Limited by |
|---|---|---|---|
| 0.10 m², 6 kg | 25.9 → 25 | 30 | area |
| 0.15 m², 12 kg | 17.3 → 17 | 15 | mass |
| 0.20 m², 20 kg | 12.95 → 12 | 9 | mass |
Area: 2.59 / area of one floodlight; mass: 180 / mass of one floodlight; rounded down. The mass of the floodlight brackets is not counted in the example. What exactly the equipment mass given in the table includes is specified in the calculation for your order; if the brackets are included, the mass limit is reached even sooner. If each floodlight has an area of 0.2 m² and a mass of 20 kg (the upper limit of the PMV range), the 180 kg assumed in the table is used up at the ninth floodlight, although twelve would fit by area. In that case you can distribute the floodlights between several masts, use the PMV range for heights from 20 m (up to 16 floodlights, 3.2 m² in total) or order an individual calculation.
What to check before ordering a PM mast
- the height is confirmed by a lighting calculation (for stadiums, masts below 15 m, i.e. PM-12 and PM-14, are not recommended; see our sports lighting guide);
- the floodlights are checked for both area and mass, and the wind pressure and terrain type are known;
- the anchor cage is ordered by its full mark. The PM-14 and PM-16 share the same M27/12 anchors but need different cages, FPM-440-850 and FPM-480-850: in an FPM mark the first number equals dimension B in the table of dimensions (440 and 480 mm) and the second is the cage height H (anchor cage sizes).
Updated:
PM masts: frequently asked questions
What heights do PM masts come in?
We make PM masts 12, 14, 16, 18 and 20 m high. For 20–34 m, the PMV range is used.
How much floodlight area can a PM mast carry?
It depends on the mast height and the wind pressure. For a PM-12, for example, from 3.32 m² at 400 Pa down to 2.0 m² at 600 Pa; the other values are in the scope table above.
What do I need to give you to order a PM mast?
The mast height, the number and mass of the floodlights, the wind region and terrain type, and the foundation type. The full list is in How to Order Poles and Masts.
What is the practical difference between a fixed and a lowering crown?
A fixed crown is rigidly attached to the top section, and the floodlights are serviced from the platform, reached by ladder. A lowering crown comes down on a winch, so the fixtures are serviced and aimed on the ground, without special equipment.
What kind of foundation does a PM mast need, and who designs it?
Reinforced concrete, with a platform (mushroom) at the bottom to prevent overturning; the mast is fixed to anchor studs cast in on two templates. The foundation is designed for the soil geology and climate of the region, and you can order that design from our company.
What documents come with a mast?
A passport, an operating manual and accompanying documentation.
Can a PM-20 go on a PMV-20 anchor cage, or the other way round?
Generally not. The PM-20 is mounted on the FPM-570-950 cage (12 M30 anchors) and the PMV-20 on the FPMV-810-1200 cage (16 M36 anchors), so a foundation built for one range usually does not fit the other. The loads are also quoted under different conditions: the PM table assumes 400–600 Pa and terrain type III, while the PMV masts are designed for wind regions 1–4 and terrain types II–IV. Compare the ranges on your own data, not on isolated figures.
Can I take values between two rows of the table for, say, a 17 m mast?
Better not. Each of the five heights in the PM range has its own base diameter, anchor cage and loads, so a different height needs an individual calculation.
Related products: High-mast lighting
More on this topic: Floodlight Masts with a Mobile Crown (PMK) · 30 m Floodlight Mast: Design, Foundation, What Determines the Price · Floodlight Masts PMS, PMZH and Our PMV, PMK: What's the Difference
Get a quote for your requirements
Send us your requirements — we will calculate the price and lead time.