Strengthening is needed when a structure no longer carries its load, or will not carry a new one. Below are the methods, how they differ in unloading and welding requirements, and what goes into the calculation. The examples come from crane runway beams, where the sources describe every method in most detail; the logic is the same for floor beams, trusses and columns. This is an overview, so there are no formulas in it on purpose.
Contents
Why structures are strengthened
There are two reasons. First, the load capacity has dropped because of defects and damage, and has to be brought back to the design value. Second, loads have grown during reconstruction, and the structure must carry more than the design allowed for. Often both apply at once, because the structure being strengthened is already worn.
In the extreme case strengthening means replacing the member. Whether strengthening or replacement is cheaper is an economic question, and the main item in it is production downtime during the work. So the options are compared with downtime in mind, not by steel cost.
Before choosing a method you need the survey results: the actual condition, the steel properties and the loads acting. These have their own articles: diagnostics and condition assessment and clarifying steel properties.
Two groups of methods
All the solutions come down to two groups. In the first, the structural form and the design scheme stay the same and metal is simply added to the section. In the second, the forces in the existing members are adjusted: supports are added, the design scheme is changed, or prestressed elements are introduced.
| Method | What it changes | What to consider |
|---|---|---|
| Adding section | Member cross-section: extra plates, strips, cover plates | Partial or full unloading is required; the strengthening elements start working only under load applied after strengthening |
| Extra supports | Span: shorter, so forces in the beam fall | Partial unloading is required; a foundation is needed for the new support |
| Changing the design scheme | Trussing, turning a simply supported beam into a continuous one | Partial unloading is required; redistribution of forces evens out the diagrams |
| Prestressed elements | High-strength tie rods introduced into the section | Minimum work to attach; the specified tension must be maintained in service |
Adding section
This is the most common method, and it is the closest to designing a new structure, with one major difference. New elements are placed not where it would be best, but where they can be fitted and fixed in a working shop with minimum dismantling. So the shape of the strengthened structure is usually not the best one for a new design.
The existing structure cannot be moved, and that dictates the details. Weld positions and the possibility of drilling holes and fitting bolts have to be considered in advance. Manual welding remains the main way of attaching, and the design requirement is as few overhead and vertical welds as possible. High-strength bolts are used less often, because holes are needed in the existing structure and that noticeably increases labour.
The existing section carries the dead load, or part of it, and the service loads are then carried together: existing metal plus the strengthening. That is why this method does not work without unloading.
Extra supports and changing the scheme
The second route is not to add metal but to reduce the forces. An extra support shortens the span. Trussing adds extra members and makes the system statically indeterminate. Closing the hinges at the supports turns a simply supported beam into a continuous one: forces are redistributed and the mid-span moment drops.
These methods even out the force diagrams, use the metal of the existing structure better and concentrate the strengthening in a few places. Like adding section, they need partial unloading.
Prestressing
This method is considered the most promising for steel structures. There are three reasons: high-strength tie material is brought into the design section, the existing metal is used more fully through adjusting the stresses, and there is a minimum of work to attach the strengthening.
There is a price. Prestressed elements need effort to maintain the specified force throughout service. One variant only increases the beam stiffness without raising the load capacity: it limits the working deflection and raises the fatigue strength of the top zone.
Example: crane runway beams
A crane runway beam is convenient for comparison: every method works effectively on it. The table gathers which spans and cranes suit each option best.
| Method | Beam span | Limits and notes |
|---|---|---|
| Symmetric added section (plates or strips on the flanges) | any | The most effective of the added-section options. The width of the bottom strip is set by the need to make the welds in the flat position. Fixing with high-strength bolts for heavy duty increases labour |
| Asymmetric added section | any | Does not need the rail fixings removed (with one exception). Four of the eight schemes are used only under light and medium duty cranes up to 80 t |
| Cover plates on the top flange | any | The most effective of the asymmetric ones: they raise the torsional resistance of the top flange and relieve the flange weld. But overhead welds are needed, so it is very labour-intensive |
| Elements near the neutral axis | any | Effectiveness is very low, the section modulus changes little. Only as a last resort |
| Additional column | any | Effective, but a foundation is needed: the sizes of the existing and the new foundation limit the span, and labour is high |
| Props (two schemes) | 9–24 m | Effective in this range of spans |
| Trussing | 6–18 m (one scheme), 12–24 m (the other two) | Overhead cranes up to 80 t |
| Closing hinges at the supports (continuity) | 6–18 m | For any crane duty and capacity. Lowest metal use and labour |
| Prestressed elements | 6–18 m | For light and medium duty cranes. Little metal and work, but the tension has to be maintained |
| Raising stiffness without raising strength | — | A separate scheme: limits deflection and raises the fatigue strength of the top zone |
What goes into the calculation
Strengthening is calculated by limit states under the current standards. For the first limit state the initial load that acted before strengthening and the additional load applied afterwards are taken. For the second, the characteristic values of the same two parts.
From there the logic is as follows. In tension and centrally compressed members the strengthening parts carry only the increase in force from loads added after strengthening. Compressed members have one more condition: buckling happens in the member with its new section, so the slenderness after strengthening goes into the calculation. For a first estimate of the strengthening area the buckling coefficient is taken at the slenderness before strengthening and then refined at the actual slenderness of the new section.
Eccentrically compressed members are strengthened while the edge stresses have not exceeded a certain share of the design resistance. The strengthening parts are fixed to the main section with continuous small welds, usually 3, 4, 5 or 6 mm. For tension members and joints, continuous welds 3–6 mm high are also recommended.
Beams have their own features. For a working shop the working condition factor is taken as 0.9, allowing for the service condition. For asymmetric strengthening an asymmetry factor of 1.1–1.5 is used and the chosen flanges are checked by section modulus. The theoretical cut-off point of the strengthening elements is found from the moment condition, and the elements are carried past that point by a length enough to transfer the force. At the cut-off the strength is also checked by the reduced stresses.
In trussed beams the design scheme is statically indeterminate, so the stiffnesses of the strengthening elements are assumed first. If after the calculation they differ from the assumed ones by more than 30 %, the calculation is repeated. A prestressed beam is calculated like an ordinary prestressed one.
What this means for fabrication
Strengthening elements are mostly plate and strip parts, cover plates, trusses and tie rods. They are made to shop drawings (KMD). The special point is that the existing structure cannot be moved, so the drawings must allow for the weld positions, the hole positions and the welder’s access on site.
In the workshop we fabricate steel structures to the customer’s drawings and prepare KM and KMD drawings when needed: KM and KMD design, steel fabrication. A survey before strengthening is a separate service. Erection on site is done by our partner construction company.
Standards and validity
The condition of the structure before strengthening is assessed under the current survey procedure and method (see the survey articles above), and the strengthening is calculated under the current steel design standards: DBN V.2.6-198:2014 «Steel structures. Design standards» and DBN V.1.2-14:2018 «General principles of reliability and structural safety of buildings and structures». Decisions are checked against the current editions of these documents.
Updated:
Frequently asked questions about strengthening steel structures
Can a structure be strengthened without stopping production?
Adding section, extra supports and changing the design scheme need partial or full unloading of the structure. Whether it can be unloaded without stopping the shop is decided by the strengthening design: the options are compared with downtime in mind.
Which is cheaper: strengthening or replacing?
That is an economic question. Strengthening is in essence repair with added capacity, replacement is the extreme case of the same thing. The main factor in the comparison is production downtime during the work.
Why does the effect of new strengthening elements not show at once?
Strengthening elements start working only under load added after strengthening. What acted on the structure before is still carried by the original section alone.
Related products: Steel structure design (structural and detail drawings) · Technical inspection · Custom steel fabrication
More on this topic: KM Drawings: Contents, Stages, Calculations · What is KMD: meaning and how it differs from KM · KMD Drawings: Contents, Benefits, Cost · KM and KMD Stages: Contents of the Sets · KM and KMD Drawing Rules: DSTU, Specification, Scales · Steel Structure Calculation: Methods and Checks
Get a quote for your requirements
Send us your requirements — we will calculate the price and lead time.