The cost of a technical inspection is worked out individually for each object — there is no universal fixed price. We explain the factors that affect it so you understand what the calculation is based on.

Technical Inspection Cost: What It Depends On

Object size and type

The larger the building or structure (area, number of floors or spans, number of structural elements), the greater the scope of inspection and calculation work, and so the cost. The material of the structures matters too: inspecting steel structures (our specialty — poles, towers, industrial facilities) has its own specifics compared with reinforced concrete or brick.

Accessibility of the structures

Inspecting structures at height, in hard-to-reach places, or at an operating facility requires special equipment or clearance (work at height, stopping equipment) — this affects timing and cost compared with free access to structures at ground level.

Scope and depth of the inspection

  • a preliminary inspection (a survey and recording of visible defects) costs less than a main (detailed) one with instrumental measurements and load-bearing capacity calculations; a main inspection is not always needed, only if the preliminary one has found defects that could reduce strength, stability or stiffness, or the needs of people with limited mobility have not been taken into account;
  • the need for laboratory tests (determining the actual steel grade or concrete strength) adds time and cost;
  • after an emergency event, or where defects and damage have been found, an inspection more often goes as far as the main (detailed) stage than a scheduled inspection of an object in good order, where the preliminary stage sometimes suffices.

Availability of design documentation

If drawings (KM/KMD) or other design documentation for the object exist, the inspection and verification calculations go faster. Without documentation, some data (sections, joints, actual dimensions) must be determined by on-site measurement, which increases the scope of work.

The object’s consequence class

The object’s consequence (responsibility) class — CC1, CC2 or CC3 — affects the required depth of verification calculations and the qualification of the executor. For more on consequence classes and who may conduct an inspection, see the article Who May Conduct a Technical Inspection of Buildings and Structures.

Timing and location

An urgent inspection (for example, after an emergency) and an object in a remote region can affect the cost through logistics and the priority of the work.

What to send for a calculation

Describe the object’s type and size, any available documentation, the purpose of the inspection (routine, before reconstruction, after an emergency) and the desired timeline. If you don’t know something, leave it blank — we will clarify it while preparing the inspection. See also technical inspection.

Example: how the scope of work is built up

A hypothetical example (the figures are for illustration only): a building whose steel structure consists of 12 frames, each made up of two columns and a truss.

1. Inventory: 12 × 3 = 36 main elements (three per frame), all inspected visually.

2. Measurements are taken selectively, for instance on every third frame: 12 ÷ 3 = 4 frames, that is 4 × 3 = 12 elements.

3. Metal samples are taken first of all from the most heavily loaded elements (verifying steel properties).

4. Then come calculations, the report and, if needed, the passport.

The cost is built up from the labour each item requires, and the actual extent of selective checks is set by the work programme.

What increases the scope and what reduces it

How each factor changes the list of work:

FactorSmaller scopeLarger scope
DocumentationKM/KMD drawings and a passport existnone, so measuring is needed
Accessstructures at ground levelheight, an operating facility
Depthvisual inspectionmeasurements, samples, calculations

What the customer should prepare

  • design documentation, the passport and earlier inspection reports;
  • records of repairs, strengthening and reconstruction;
  • information on new equipment, extensions or a new use;
  • access conditions: passes, equipment shutdown, a responsible person;
  • the purpose and the result needed: a report or a passport.

Typical mistakes when ordering an inspection

  • comparing offers without one technical specification: one covers only a survey, another also samples and calculations;
  • ordering only a visual inspection when reconstruction needs calculations, so the inspection is repeated;
  • not mentioning changes in the loads during operation.

What the work you pay for consists of

The technical specification sets the scope of work, and the stages are defined by the current Procedure. The scope at each stage depends on different factors:

StageWhat is doneWhat the volume depends on
PreparationThe documentation and the object are studied; a work programme is drawn up from the agreed technical specificationWhether a design, a passport and earlier reports exist
Preliminary inspectionA continuous visual examination: defects are recorded and photographed, a preliminary conclusion is givenSize of the object, access to the structures
Main (detailed) inspectionAnalysis of defects and their causes, actual loads, measurements, verification calculationsNumber of structures, need for samples and calculations
Final documentThe object passport after a scheduled inspection, or a report with recommendationsGrounds for the inspection, requirements of the technical specification

More on the stages in the article Technical Inspection of Buildings and Structures: Procedure and Passportisation.

What to check in an offer before comparing prices

Two offers with different prices often describe different work. Check five things:

What to checkWhy it changes the price
Examination on siteAn inspection is not carried out without examining the object (exceptions are set by Minrozvytku), so an offer without a site visit is incomplete.
Whole object or part of itA passport is drawn up only for the object as a whole, not for a part of it, individual elements or engineering networks.
StagesOne offer may cover only the preliminary inspection, another also the main one with measurements and calculations.
Final documentA passport after a scheduled inspection or a report with recommendations: the drawing-up requirements differ, and the required document is stated in the technical specification.
Consequence class and certificateThe executor must hold a certificate for the class of your object; for a higher class the verification calculations go deeper.

On certificate classes, see Who May Conduct a Technical Inspection.

Updated:

Technical inspection cost: frequently asked questions

How much does a technical inspection of a building cost?

There is no universal price — the cost is calculated individually based on the object’s size and type, accessibility, scope of work, available documentation and consequence class. Send us a description of the object and we will calculate the cost and timeline.

Does the object’s consequence class affect the cost?

Yes. A higher consequence class (CC2, CC3) usually requires deeper verification calculations and a more highly qualified executor than CC1.

Is an inspection cheaper if design documentation is available?

Usually yes — existing drawings reduce the amount of on-site measurement work. Without documentation, some data has to be determined directly at the object.

How does the cost of a post-emergency inspection differ from a routine one?

An inspection after an emergency event more often needs the main (detailed) stage, with measurements and calculations, and prompt execution, which can affect cost and timing compared with a scheduled inspection.

How should I compare inspection offers?

Give every executor the same technical specification and compare the scope (survey, measurements, samples, calculations), the result (report or passport), the executor’s qualification (the consequence class they are entitled to work with) and the timing, not just the bottom line.

Is a strengthening design included in the inspection cost?

The inspection ends with a report with recommendations, and after a scheduled one an object passport is also drawn up on the basis of the report. A strengthening design, if needed, is priced separately as the next stage (see steel structure design).

Can I inspect only part of a building and get a passport?

No. A passport is drawn up for the object as a whole: it is not drawn up from an inspection of part of an object, individual structural elements or engineering networks. Such work is smaller in scope, but it will not produce a passport.

Can I order an inspection without a visit to the object?

No. An inspection based only on photographs, video or drawings, without examining the object on site, is not allowed, except in cases set by the ministry responsible for construction (Minrozvytku).