Floodlight Mast with a Lightning Rod: Combining Lighting and Protection
A floodlight mast with a lightning rod does two jobs at once: the floodlights sit on the platform, and an air terminal above it takes the strike and sends the current into the ground. This article shows what depends on what: terminal height, shaft joints, earthing and test points. It is a customer’s guide, not a replacement for a lightning protection design.
A floodlight mast with a lightning rod is a mast with an air terminal above the floodlight platform; the current runs from it down a down-conductor, which can be the steel shaft itself, to the earthing. The protected zone is set by a calculation under the standard.
Contents
What a mast with an air terminal means
It is a mast where an air terminal stands above the floodlight platform and the current runs down through a down-conductor to the earthing. In PMT and PMV floodlight masts the lightning rod is part of the structure, together with the service platform and the stairs with a guard rail. For PMZh we make the steel fittings: the floodlight platform, the ladder and the air terminal, and we do not supply the reinforced concrete.
Read the height carefully. In the PMS, PMZh and PMS-B designations the number is the height to the floodlight platform, and the overall height is greater by the length of the lightning rod.
The table shows what the protection on such a mast consists of.
| Part | What it is on a floodlight mast |
|---|---|
| Air terminal | the element above the floodlight platform; its height goes into the calculation request |
| Down-conductor | can be the steel shaft itself if the joints are reliable, the cross-section meets Table 6 of DSTU EN 62305-3 and the design provides for it |
| Earthing | electrodes in the soil; the standard recommends a resistance of up to 10 ohm |
| Floodlights | sit on the platform; their number and model are named in the request |
| Mobile crown | on PMK masts a winch lowers the crown with the floodlights; how the terminal is combined with it is settled by the design |
The protected zone and the class of the system are set by an engineer’s calculation under the standard, not by the mast itself.
Terminal height and the protected zone
How much area a terminal covers depends on its height above the protected area and on the class of the lightning protection system (I–IV; I is the highest level). Under Table 2 of DSTU EN 62305-3 the largest rolling sphere radius is 20, 30, 45 and 60 m for classes I–IV. The higher the protection level, the smaller the radius and the closer the masts stand.
A lighting mast stands where the lighting calculation needs it. Whether its terminal covers the required area is shown by the protection zone calculation. For a large area several masts are usually installed.
The three calculation methods are described in Lightning Rod Protection Zone Calculation, and a quick estimate of the radius by the sphere method comes from the calculator.
The shaft as a down-conductor and section joints
There may be no separate wire along the mast: DSTU EN 62305-3, cl. 5.3.5 a, lets a metal structure serve as a down-conductor if its parts are reliably connected (cl. 5.5.3) and the dimensions are not below Table 6. For hot-dip galvanised steel that is 50 mm² (strip, solid round or stranded conductor; the exact tube wall section is set by the design). An insulating coating does not interfere (note 1).
The clause is written for parts of structures, so for a mast it is read by analogy. The tube cross-section calculation and the comparison with the standard are in Steel Mast as an Air Terminal and Down-Conductor.
The practical conclusion is simple: the weak spot is not the tube but the section joints. On our lightning rods the sections are joined by a telescopic joint. Dirt collects on flanged section joints and corrosion starts, bolts included, while a telescopic joint has no such problems. The drawing of the joints and welds still deserves separate attention.
How to run cables to the floodlights when the mast serves as a lightning rod is described in Floodlight Mast 30 m.
Earthing and the test joint
The standard recommends an earthing resistance of up to 10 ohm (cl. 5.4.1). The earth termination is made as type A (external electrodes, at least two) or type B (a ring or foundation electrode; cl. 5.4.2). Electrode lengths and the PUE requirements for lighting poles are covered in Earthing of Metal Poles.
A test joint is fitted on each down-conductor (cl. 5.3.6). The exception is a natural down-conductor connected to a foundation earth electrode. The joint is opened only with a tool: it exists so that earth resistance can be measured without taking the system apart.
After erection, continuity and earthing resistance are measured. A specialist does this work; do not touch down-conductors and connections at height yourself.
Floodlights and the mobile crown
On PMK masts the floodlights are serviced from the ground: a winch lowers the crown with the equipment and then raises it again. No special machinery is needed. The standard PMK range is 20, 25, 30, 35 and 40 m.
The crown moves, while the air terminal and the down-conductor must stay reliably connected. The air terminal is fixed through a flange joint, on PM and PMV masts as well as on PMK.
All mast ranges are on the Floodlight Masts page, and the designations are compared in PMS, PMZh, PMV and PMK.
What to send for the calculation
To propose a structure we need:
- the mast height;
- the number and model of the floodlights;
- whether an air terminal is needed and how tall;
- whether a ladder and guard rail are needed;
- the city, the wind pressure zone and the terrain type.
The POLYGONAL company makes the mast with an air terminal. The system class and the protected zone are calculated by an engineer under the standard, and erection is carried out by a licensed construction partner company. Send the data through the Lightning Rods page.
Updated:
Frequently asked questions about a floodlight mast with a lightning rod
Can a lightning rod be fitted to a floodlight mast?
Yes. Floodlight masts are made with an air terminal, and the request states whether one is needed and how tall. We also make and design combined lightning rods that work as lighting poles.
Is the mast shaft a down-conductor?
It can be, if the joints are reliable, the cross-section meets Table 6 of DSTU EN 62305-3 and the design provides for it. The tube alone is not enough: the section joints decide.
How is the earthing of a mast checked?
After erection, continuity and earthing resistance are measured. A test joint on the down-conductor makes the measurement easier. A specialist does it, not the owner of the mast.
Does a mobile crown affect lightning protection?
The crown moves, so the link between the terminal and the down-conductor on such a mast must be provided for in the design. The air terminal itself is fixed through a flange joint, as on PM and PMV masts.
Is it enough to install a mast to protect the site?
No. A mast is only an air terminal with a supporting structure. External protection also includes a down-conductor and earthing, and surge protection of electrical systems inside the site is treated separately.
What terminal height should I choose?
The protection zone calculation decides: system class, height and size of the site, mast positions. Give the terminal height in the request together with the mast height, and leave blank what you do not know.
Related products: Lightning protection masts and air-termination rods
More on this topic: Lightning Protection Norms: Why the Old Standard Was Withdrawn and What Applies Now · Calculating a Lightning Rod's Protection Zone: Methods and an Example · Lightning Protection of Masts and Towers: Choosing a Lightning Rod · A Steel Mast as Air-Termination and Down-Conductor per DSTU EN 62305-3 · Lightning Protection Inspection and Maintenance: Intervals, Checks, Records · Lightning Rod, Air Terminal, Lightning Protection: What's the Difference
Get a quote for your requirements
Send us your requirements — we will calculate the price and lead time.